- ²ÝÁñÉçÇø Bond Progress
- Standardization & Equity Projects
-
March 5, 2024 Update:
- Saginaw High School – RTU replacements will be completed spring break 2024
- Saginaw High School – Begin design discussions of fieldhouse renovations will begin summer 2025
- Saginaw High School – Audio/video upgrades for the performing arts center will be completed spring 2025
- Marine Creek Parkway traffic signal will be completed December 2024
- Highland Middle School – RTU/Roof replacements will be completed summer 2024
- Saginaw Elementary School – HVAC system will be completed summer 2024
- Creekview Middle School – RTU replacements will be completed summer 2024
- Exterior improvements for drive-up appeal at 14 campuses (CSES, EMES, GES, GFES, HCES, LPES, NBES, PES, RPES, WCES, EWMS, PVMS, SHS, CRES) will be completed in summer 2024
- Add Eagle Mountain-Saginaw ISD building letters districtwide will be completed in summer 2024
- Gililland Elementary School – Courtyard renovation will be completed summer 2024
- Natatorium – Design in progress with the YMCA with construction beginning in the winter of 2024
- October 2023 Update:
- Currently under construction or in the design phase:
- Roof/RTU replacements – SHS,SES,HMS
- RTU Replacements – HDC,CMS
- Building lettering – All campuses before MCMS (adding Eagle Mountain-Saginaw I.S.D.)
- Courtyard renovation – GES
December 2021 Update:
-
Campuses identified received the Discovery Cave and Spinning Cozy Pod. New swing system at Northbrook ES and Elkins ES.
September 2021 Update:
- Hellas has begun turf installation at Chisholm Trail HS and will start soon at Saginaw HS.
August 2021 Update:
- Work continues at Elkins Elementary in the Barbara Christenson gym on the walls and installation of the hard ceiling. Additionally, The sidewalk along Elkins School Road has been completed.
- At Eagle Mountain Elementary, new seating and stage curtains have been delivered and installed.
- At Creekview Middle School, the sidewalk connecting the housing addition to the campus has been completed.
- At Chisholm Trail and Saginaw HS, progress continues on baseball and softball areas.
July 2021 Update:
- Moisture conditioning and final grade is in progress in both baseball and softball fields.
June 2021 Update:
- Baseball fields turf projects at Saginaw and Chisholm Trail HS are in beginning stages of moisture conditioning.
September 2020 Update:
- Shade structures complete at Eagle Mountain and Remington Pointe elementary schools.
August 2020 Update:
- Turf placement is ongoing at Prarie Vista and Creekview middle schools.
- E-layer mobilizing is taking place at Ed Willkie Middle School.
- Highland Middle School is waiting on track surfacing crew.
- Turf placement is ongoing at Chisholm Trail High School.
- Turf is in progress, placing infill, at Saginaw High School.
July 2020 Update:
- Currently installing colector drain for turf project at Prairie Vista Middle School. Estimated completion August 17.
- Currently installing e-layer/cushdrain for turf project Creekview Middle School. Estimated completion August 19.
- Cushshdrain finishing and beginning e-layer for turf project at Saginaw HS. Estimated completion August 13.
- Currently installing cushdrain for turf project at Chisholm Trail HS. estimated completion August 17.
- Tennis courts are resurfaced and winslats installed at Saginaw HS, Chisholm trail HS, Prairie Vista MS, and Ed Willkie MS.
June 2020 Update:
- Highland, Prairie Vista, Willkie, and Creekview MS turf projects are underway. Projects are also underway for Chisholm Trail HS and Saginaw HS.
- Saginaw HS, Prairie Vista MS, and Ed Willkie MS.- Purchase order has been created and coordinating schedule with Hellas Construction.
- Saginaw HS, Prairie Vista MS, Ed Willkie MS, and Chisholm Trail HS – waiting delivery
May 2020 Update:
- Saginaw HS, Prairie Vista MS, and Ed Willkie MS waiting on materials for tennis court resurfacing and wind slats.
- Highland, Creekview, Prairie Vista, and Ed Willkie MS and Chisholm Trail HS are receiving grading and soil preparation for turf installation.
- Moisture conditioning continues at Saginaw HS for turf installation.
- Track resurfacing is completed at Saginaw and Chisholm Trail high schools, finalizing the punch list.
- Boswell HS strictural spray is complete, and stripping is in progress.
- Saginaw HS, Prairie Vista MS, and Comanche Springs Elementary recieved new flooring.
April 2020 Update:
- Turf field installation begins at Saginaw High School and Highland, Creekivew, and Prairie Vista middle schools.
- Several campuses across the district will recieve new flooring or carpet.
-
December 2021 Construction Photos
-
September 2021 Construction Photos
Hellas has begun turf installation at Chisholm Trail HS.
-
August 2021 Construction Photos
Pictured above left, progress continues in the Elkins Elementary Gym. Pictured above middle, the sidewalk along Elkins School road is scomplete. Pictured above right, the Creekview Middle School sidewalk connecting housing to the campus is complete.
Pictured above left and right, construction continues on baseball and softball areas at Chisholm Trail and Saginaw High Schools.
-
June and July 2021 Construction Photos
July 2021: Moisture conditioning and final grade is in progress in both baseball and softball fields.
June 2021: Baseball fields turf projects are in beginning stages of moisture conditioning. -
August/September 2020 Construction Photos
Shade structures complete at Eagle Mountain and Remington Pointe elementary schools.
-
July 2020 Construction Photos
Pictured from left, tennis courts have been resurfaced and windslats have been installed at Saginaw HS, Chisholm Trail HS, Prairie Vista MS, and Ed Willkie MS. Cushdrain and e-layer installation have occured at Saginaw HS.
-
June 2020 Construction Photos
Turf projects are underway at several middle and high schools.
-
May 2020 Construction Photos
Turf installation prep is occuring at Highland, Creekview, and Ed Willkie middle schools.
Pictured above from left, Comanche Springs Elementaty and Saginaw High School recieved new flooring.
-
April 2020 Construction Photos
Turf installation begins at several middle and high school campuses.